|
关注:1
2013-05-23 12:21
求翻译:直接采用整体式钢模台车衬砌,模板和钢筋的加工安装按照规范及图纸设计要求的方法进行施工。是什么意思?![]() ![]() 直接采用整体式钢模台车衬砌,模板和钢筋的加工安装按照规范及图纸设计要求的方法进行施工。
问题补充: |
|
2013-05-23 12:21:38
Directly using integrated steel trolley lining, installation of steel processing templates and specifications and drawings in accordance with the method of construction design requirements.
|
|
2013-05-23 12:23:18
Direct application of a holistic-type steel form wagon lining, templates and steel used in the processing installation in accordance with norms and methods of construction drawings design requirements.
|
|
2013-05-23 12:24:58
Uses the integral-type steel die trolley lining work directly, the template and the steel bar processing installment carries on the construction according to the standard and the blueprint design request method.
|
|
2013-05-23 12:26:38
Direct integral steel formwork jumbo to lining, templates, and processing of steel bar installation according to the requirements specification and design of the drawing methods of construction.
|
|
2013-05-23 12:28:18
Directly using integrated steel trolley lining, installation of steel processing templates and specifications and drawings in accordance with the method of construction design requirements.
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区