当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:11.1.13 As for area affected by heavy rigging work, Contractor shall take into consideration and plan his work to be performed post to heavy rigging work execution. Contractor is requested to construct soil improvement and ground reinforcement work in the affected area within the limited time frame. The incurred cost s是什么意思?

待解决 悬赏分:1 - 离问题结束还有
11.1.13 As for area affected by heavy rigging work, Contractor shall take into consideration and plan his work to be performed post to heavy rigging work execution. Contractor is requested to construct soil improvement and ground reinforcement work in the affected area within the limited time frame. The incurred cost s
问题补充:

  • 匿名
2013-05-23 12:21:38
11.1.13为受影响地区的重型吊装工作,承包商应考虑和他的工作计划后进行重型吊装工作执行。承包商被要求在有限的时间框架内构建在受影响地区的土壤改良和地基加固工作。费用应包括在合同
  • 匿名
2013-05-23 12:23:18
13.11.1*受影响的区域的重型装配工作,承包商应考虑到他的工作和计划执行开机自检重装配工作执行。 承建商要求构建土壤改良和地面加固工作受影响的地区在有限的时间内。 所引起的费用应包括在合同
  • 匿名
2013-05-23 12:24:58
11.1.13 关于繁重索具工作的影响的区域,承包商将考虑到并且计划他的工作是执行的岗位到重的索具工作施行。 承包商在受影响的区域请求修建土壤改良和地面增强工作在有限的时间表之内。 招致的费用在合同将包括
  • 匿名
2013-05-23 12:26:38
11.1.13 受重索具的工作区,承建商应考虑和计划他的工作被执行重索具工作执行开机自检。承建商要求构建土壤改良和在有限的时间范围内的受影响地区地面加固工作。而招致的费用须包括在合同
  • 匿名
2013-05-23 12:28:18
11.1.13 至于地区受重的索具工作影响,承包商将考虑和计划有待实行的他的工作张贴到重的索具工作
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭