求翻译:POWERGRID has been seamlessly upgraded ±500kV Talcher(ER) – Kolar(SR) HVDC terminal from 2000MW to 2500MW without changing of any equipment. That has been achieved with enhanced cooling of transformer and smoothing reactor with meager cost. The pay back period is about 2-3 years.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
POWERGRID has been seamlessly upgraded ±500kV Talcher(ER) – Kolar(SR) HVDC terminal from 2000MW to 2500MW without changing of any equipment. That has been achieved with enhanced cooling of transformer and smoothing reactor with meager cost. The pay back period is about 2-3 years.
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
您提供电力网故障隔绝并提高了已无缝升级为±500kV talcher(ER)-福音派信徒(SR)hvdc终端从2000兆瓦到2500MW而不更改任何设备。 这方面已经取得了增强的散热和平滑处理的变压器与电抗器费用少得可怜。 回本期的薪酬约为2年。
  • 匿名
2013-05-23 12:24:58
POWERGRID是无缝被升级的±500kV Talcher (ER) - Kolar (SR) HVDC终端从2000MW到没有改变的2500MW所有设备。 那达到了与改进的冷却变压器和使反应器光滑以微薄的费用。 薪水期间是大约2-3年。
  • 匿名
2013-05-23 12:26:38
发射器已无缝升级 ± 500kv Talcher(ER) — — 从 2000MW 到 2500MW 而无需更改任何设备的 Kolar(SR) 高压直流输电终端。取得了与增强的变压器冷却和平滑反应器的微薄的成本。付薪背期间是约 2-3 年。
  • 匿名
2013-05-23 12:28:18
POWERGRID 是的 无缝地是 升级 ?500kV Talcher(ER) - 从 2000MW 到无任何设备的改变的 2500MW 的 Kolar(SR) HVDC 终端。那被完成了具以贫乏的损失提高跨前和使人光滑反应体的变冷。偿还时期是大约 2-3 年。
 
 