求翻译:11.3.8 Cost for Modified or Deleted Welding Joint. The cost of repairs, including additional examination required by specification to rectify rejected welding joints or material, shall be borne by Contractor due to contractor’s failure.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
11.3.8 Cost for Modified or Deleted Welding Joint. The cost of repairs, including additional examination required by specification to rectify rejected welding joints or material, shall be borne by Contractor due to contractor’s failure.
问题补充:

  • 匿名
2013-05-23 12:21:38
11.3.8修改或删除的焊接接头的成本。修理费用,包括规范整顿拒绝焊接接头或材料所需的额外考试,应由承包商由于承包商的失败。
  • 匿名
2013-05-23 12:23:18
11.3*成本的修改或删除焊接接头。 修理费用,包括所需的额外的审查规范,纠正被拒绝焊接接头或材料,应由承包商由于承包商的失败。
  • 匿名
2013-05-23 12:24:58
11.3.8 费用为修改过的或被删除的焊接的联接。 修理费,包括规格要求的另外的考试矫正拒绝了焊接联接或材料,将由Contractor负担由于承包商的失败。
  • 匿名
2013-05-23 12:26:38
11.3.8 构造修改或删除成本焊接接头。的修复,包括额外考试规范需纠正被拒绝的焊接接头或材料,费用应由承建商承建商的失败。
  • 匿名
2013-05-23 12:28:18
11.3.8 为被修改的或者被删除的焊接关节花费。维修的费用,包括被规格要求纠正被拒绝的焊接关节或材料的其他的考试,将由于承包商的故障被承包商忍受。
 
 