当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The work covers survey for location of excavation area, excavating, loading, transportation of excavated soil to the temporary deposit area designated by TOYO (distance is less than 2 km), unloading and bulldozing the soil to be flat on occasional demands, stripping, scraping, trimming and compaction of excavated botto是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The work covers survey for location of excavation area, excavating, loading, transportation of excavated soil to the temporary deposit area designated by TOYO (distance is less than 2 km), unloading and bulldozing the soil to be flat on occasional demands, stripping, scraping, trimming and compaction of excavated botto
问题补充:

  • 匿名
2013-05-23 12:21:38
工作包括调查发掘面积的位置,挖掘,装载,挖掘土壤东洋(距离不到2公里)指定的临时存放区的运输,装卸和推土的土壤,是偶尔的需求持平,剥皮,刮,修剪和出土的底部,股票压实桩和再处理,恢复,农膜和脱水,防止地表水运行,直到回填到挖掘坑,还包括护坡,检测现有的天然或人工的性质,和岩石的地下障碍物,要么挖。下切的,应当填写,并与批准的情况下地球床和混凝土或水泥砂浆的沙子或土壤压实应填补的情况下岩床中使用。
  • 匿名
2013-05-23 12:23:18
这, 那; 这些, 那些
  • 匿名
2013-05-23 12:24:58
  • 匿名
2013-05-23 12:26:38
工作包括调查发掘区,挖掘、 装载、 运输到指定的东洋暂存款区域挖土的位置 (距离是小于 2 公里),卸载和推土平上偶尔的需求、 剥离、 刮、 修剪和压实度挖的底股票打桩和回收、 还原、 薄板、 脱水、 防止地表水进挖坑回填直到运行,也涵盖护坡、 地下障碍存
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭