求翻译:我部承建的大陆两轮项目消防联动线需从大陆四轮一期水泵房内引出,因涉及一期设备供应商及消防安装施工单位配合,现我部多次进入四轮泵房接线未果,恳请管理公司予以协调,并尽快进行消防联动测试以免延误两轮厂房正常使用,谢谢。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
我部承建的大陆两轮项目消防联动线需从大陆四轮一期水泵房内引出,因涉及一期设备供应商及消防安装施工单位配合,现我部多次进入四轮泵房接线未果,恳请管理公司予以协调,并尽快进行消防联动测试以免延误两轮厂房正常使用,谢谢。
问题补充:

  • 匿名
2013-05-23 12:21:38
I am Ministry of the construction of the continent two Project Fire Line need a pump room leads from the mainland four involving an equipment supplier and fire installation and construction units with and I am now the Ministry of multiple entry and the connection of four pumping stations failed, urg
  • 匿名
2013-05-23 12:23:18
  • 匿名
2013-05-23 12:24:58
Our unit construction mainland two turn project fire prevention association generatrix must draw out from a mainland four turn issue of water plant, because involves an issue of equipment supplier and the fire installment construction coordinates, present our unit many times enters four turn pump ho
  • 匿名
2013-05-23 12:26:38
Construction in our Department of mainland two-wheels project of fire fighting linkage line needed four rounds of one-stage pumps from mainland China led in the room because they related to equipment suppliers and construction units of fire protection installation with a period, my Ministry several