当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:在机器后侧机头部分主电机安装支架左侧如图位置打四个φ3.2的孔,攻M4螺纹,然后分别装上PVC管卡及元宝座。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
在机器后侧机头部分主电机安装支架左侧如图位置打四个φ3.2的孔,攻M4螺纹,然后分别装上PVC管卡及元宝座。
问题补充:

  • 匿名
2013-05-23 12:21:38
In the machine the back of the nose section of the main motor mounting bracket to the left side of Figure position to play four the φ3.2 of the hole, tapping m4 thread, and then were fitted with pvc pipe card and the throne.
  • 匿名
2013-05-23 12:23:18
In the machine side after the first part of the key motor mounting bracket as shown to the left of 4 the hole should be 3.2 to 4 threads M attack, and then loaded on the card and $PVC throne.
  • 匿名
2013-05-23 12:24:58
Installs left side of the support in the machine rear end nose section host electrical machinery like the chart position to hit four φ3.2 holes, attacks the M4 thread, then installs the PVC tube card and a Yuan throne separately.
  • 匿名
2013-05-23 12:26:38
At the rear side of the machine head main motor mounting bracket left figure position to play four holes φ 3.2, tapping M4 thread, and then attach the PVC clamp and throne.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭