当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:在巡视中发现联钢附属小房承包商亿隆在工程进度计划安排不合理,施工工艺不合理,材料准备不到位。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
在巡视中发现联钢附属小房承包商亿隆在工程进度计划安排不合理,施工工艺不合理,材料准备不到位。
问题补充:

  • 匿名
2013-05-23 12:21:38
United Steel subsidiary housing contractor billion Long in project planning arrangements is unreasonable, irrational construction techniques, material preparation is not in place in the inspections.
  • 匿名
2013-05-23 12:23:18
In the course of inspections revealed that the steel subsidiary small contractors in 100 million, progress of the construction schedule is not reasonable, the construction process is not reasonable, material preparation.
  • 匿名
2013-05-23 12:24:58
In patrolling discovered the association steel attached young Fang contractor hundred million swells in the project progress plan arrangement is unreasonable, the construction craft is unreasonable, the material preparation does not arrive.
  • 匿名
2013-05-23 12:26:38
Found during an inspection of the steel subsidiary of Metropolitan contractors million lung project progress schedule is not reasonable, unreasonable construction technology, materials preparation is not in place.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭