|
关注:1
2013-05-23 12:21
求翻译:the electrical interlocks involve the detection of OHL voltage by a voltage transformer(VT)installed at each side of the bypass isolator,coupled with the monitoring of VT MCB status(tripped or not).given that the VT MCB is in close position(i.e.,not tripped)and there is no voltage measured on the OHL,the close operatio是什么意思? 待解决
悬赏分:1
- 离问题结束还有
the electrical interlocks involve the detection of OHL voltage by a voltage transformer(VT)installed at each side of the bypass isolator,coupled with the monitoring of VT MCB status(tripped or not).given that the VT MCB is in close position(i.e.,not tripped)and there is no voltage measured on the OHL,the close operatio
问题补充: |
|
2013-05-23 12:21:38
电气联锁涉及通过安装在每个侧旁路隔离电压互感器(VT),加上VT MCB状态(或不跳闸)监测检测的OHL电压的。VT MCB是在关闭位置(即不跳闸),有没有电压测量的OHL,旁路隔离开关关闭操作将启用
|
|
2013-05-23 12:23:18
涉及的电气联锁装置的检测电压,ohl的电压互感器(VT)安装在每个侧面的绕过隔离器,加上监测VT MCB状态(跳闸).鉴于VT MCB在关闭位置(即,不跳闸),没有测量的电压,ohl,关闭操作的绕过隔离器将被启用
|
|
2013-05-23 12:24:58
电子保险设备由电压变压器(VT)介入OHL电压的侦查安装在旁路绝缘物的每边,被结合以VT MCB状态(被绊倒或没有) .given监视VT MCB在接近的位置(即,没被绊倒),并且没有在OHL测量的电压,旁路绝缘物的接近的操作将使能
|
|
2013-05-23 12:26:38
电气联锁装置涉及安装在旁路隔离器,加上监测的 VT MCB status(tripped or not).given VT 小型断路器处于关闭位置 (i.e.,not 跌了一跤),有没有电压测量 OHL,绕过隔离器的关闭操作上将会启用的每一侧的电压互感器 (VT) OHL 电压检测
|
|
2013-05-23 12:28:18
电互锁按电压涉及 OHL 电压的查出 transformer(VT) 安装在旁路隔离器的每一边,伴随着 VT MCB 在接近的 position(i.e.,not tripped) 中的 VT MCB status(tripped or not) .given 的监测和
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区