当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:12.4.1.3. Acceptance Criteria: Unless stated otherwise in the performance specification, it is necessary to confirm that the module and system perform in a predictable manner consistent with the performance specification. Also, verify that the module and system return to normal operation after the short or open is remo是什么意思?

待解决 悬赏分:1 - 离问题结束还有
12.4.1.3. Acceptance Criteria: Unless stated otherwise in the performance specification, it is necessary to confirm that the module and system perform in a predictable manner consistent with the performance specification. Also, verify that the module and system return to normal operation after the short or open is remo
问题补充:

  • 匿名
2013-05-23 12:21:38
12.4.1.3。验收标准:除非另有说明的性能规格,它是必要的,以确认模块和系统执行的性能规格在可预见的方式一致。同时,确认没有损坏的模块,模块和系统恢复正常运行后短路或开路被移除,并且发生了:ISO 16750 C类操作。
  • 匿名
2013-05-23 12:23:18
  • 匿名
2013-05-23 12:24:58
  • 匿名
2013-05-23 12:26:38
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭