当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:本文以北京地铁八号线安华桥站~安德里北街站区间施工情况为依托,采用理论分析、数值模拟、工程实践相结合的手段进行研究是什么意思?

待解决 悬赏分:1 - 离问题结束还有
本文以北京地铁八号线安华桥站~安德里北街站区间施工情况为依托,采用理论分析、数值模拟、工程实践相结合的手段进行研究
问题补充:

  • 匿名
2013-05-23 12:21:38
Beijing subway on the 8th line to Andri Anwar Bridge Station North Street station interval construction rely on theoretical analysis and numerical simulation, the combination of engineering practice means to study
  • 匿名
2013-05-23 12:23:18
In this Beijing subway line 8 of the bridge to North Street, line construction site, and to rely on the theoretical analysis, numerical simulation, and engineering with the practical tools for research
  • 匿名
2013-05-23 12:24:58
This article stands north ~ Andry take the Beijing subway eight line Anwar bridge the street station sector construction situation as a backing, uses the method which the theoretical analysis, the value simulation, the project practice unifies to conduct the research
  • 匿名
2013-05-23 12:26:38
This line of Beijing Metro Line 8 North anhua Bridge station ~ an deli station based on interval construction, combining theoretical analysis, numerical simulation, engineering practice to study the means of
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭