|
关注:1
2013-05-23 12:21
求翻译:模具夹板未经热处理,冲压时间过长后,导致冲子向上偏移而变短,使得铆接时候未铆接到位.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
模具夹板未经热处理,冲压时间过长后,导致冲子向上偏移而变短,使得铆接时候未铆接到位.
问题补充: |
|
2013-05-23 12:21:38
Mold jaws without heat treatment, stamping time is too long, resulting in that the punch is offset in the upward direction becomes shorter, making caulking when not caulked in place.
|
|
2013-05-23 12:23:18
正在翻译,请等待...
|
|
2013-05-23 12:24:58
The mold clamping plank has not passed through the heat treatment, after the ramming time excessively is long, causes to flush the child to displace upwardly shortens, causes the riveted joint time not riveted joint arriving.
|
|
2013-05-23 12:26:38
Splint without heat treatment of mould, dies after a long period of time, lead to punch up the offset and shorter, makes does not rivet to rivet time.
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区