当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:对不起,现在才给你回邮件。关于马鞍山WWTP,改造以后污水厂的能耗没有按照预期实现降低,主要是因为在线传感器不能很好的工作,此外,水泵由于机械故障,因此没有完全实现我们设想的运行模式是什么意思?

待解决 悬赏分:1 - 离问题结束还有
对不起,现在才给你回邮件。关于马鞍山WWTP,改造以后污水厂的能耗没有按照预期实现降低,主要是因为在线传感器不能很好的工作,此外,水泵由于机械故障,因此没有完全实现我们设想的运行模式
问题补充:

  • 匿名
2013-05-23 12:21:38
Sorry, now back to your e-mail. Ma On Shan wwtp, the energy consumption of the wastewater treatment plant after the transformation is not as expected to achieve lower, mainly because of the online sensor does not work well, In addition, the pump due to mechanical failure, so not completely run mode
  • 匿名
2013-05-23 12:23:18
I'm sorry, but now I have to give you back to the mail. Ma On Shan on WWTP after transformation, the sewage treatment plant is not in accordance with the expected energy consumption reduction, mainly because the line sensor is not a very good job, in addition, the water pump due to mechanical failur
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
Sorry, now give you back to the message. On the Ma On Shan WWTP, rehabilitation of wastewater treatment plant did not follow the expected lowering of energy consumption in the future, mainly because of the online sensor does not work very well and, in addition, pumps due to a mechanical failure, the
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭