当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:文中对统筹方法编制进度计划中的劳动工日数和机械台班数的应用有所介绍,并附有某工程施工进度计划横道图。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
文中对统筹方法编制进度计划中的劳动工日数和机械台班数的应用有所介绍,并附有某工程施工进度计划横道图。
问题补充:

  • 匿名
2013-05-23 12:21:38
The article on the integrated approach in the preparation of the schedule of labor man-days and the number of applications Jixietaiban is introduced, along with a construction schedule bar chart.
  • 匿名
2013-05-23 12:23:18
In preparation for co-ordinating methods in the progress of the projects and the mechanical Taiwan labor 58,101 number of classes of the application has been introduced and is accompanied by a horizontal road map plan the works progress.
  • 匿名
2013-05-23 12:24:58
In the article to plans in the method establishment progress plan a work man-day of number and the mechanical stage Ban Shu application has the introduction, and attaches some project construction progress plan by-way chart.
  • 匿名
2013-05-23 12:26:38
In this integrated and method for scheduling the labor shadow days in application of number and mechanical classes is described, with the construction of a project schedule Bar Chart.
  • 匿名
2013-05-23 12:28:18
In the article to plans in the method establishment progress plan a work man-day of number and the mechanical stage Ban Shu application has the introduction, and attaches some project construction progress plan by-way chart.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭