|
关注:1
2013-05-23 12:21
求翻译:8月27-29日与Steve Leistner先生在长春对EA211缸体、缸盖模具进行了技术交流,确定MPI缸盖浇注采用同TSI缸盖形同的倾转浇注工艺,需要得到Stark先生的确认,请给我们一个书面的回复。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
8月27-29日与Steve Leistner先生在长春对EA211缸体、缸盖模具进行了技术交流,确定MPI缸盖浇注采用同TSI缸盖形同的倾转浇注工艺,需要得到Stark先生的确认,请给我们一个书面的回复。
问题补充: |
|
2013-05-23 12:21:38
August 27-29 in Changchun steve leistner Mr. ea211 cylinder block, cylinder head mold technology exchange, determine mpi cylinder head casting tilting just like with tsi cylinder head casting process, need to be stark Mr. confirm Please give us a written reply.
|
|
2013-05-23 12:23:18
August 27-29 and Mr. Steve Leistner EA in Changchun to 211 block, cylinder head mold for the exchange of technology, determine MPI cylinder head gate TSI cylinder head with the tip of the gating process, Mr. Stark needs to be recognized, please give us a written response.
|
|
2013-05-23 12:24:58
August 27-29 and Mr. Steve Leistner in Changchun to the EA211 cylinder body, the cylinder cover mold has carried on the technological exchange, determined the MPI cylinder cover casting uses with the TSI cylinder cover shape with leans transfers the casting craft, needs to obtain Mr. Stark confirmat
|
|
2013-05-23 12:26:38
August 27-29th in Changchun with Steve Leistner to exchange the EA211 cylinder block and cylinder head mold, determines MPI cylinder head casting with TSI cylinder head is tilting pouring process, need to be confirmed by the Stark, please give us a written reply.
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区