|
关注:1
2013-05-23 12:21
求翻译:7、水泵等设备基础施工应与到货设备核对无误后再进行,并在设备生产厂家的指导下进行安装调试。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
7、水泵等设备基础施工应与到货设备核对无误后再进行,并在设备生产厂家的指导下进行安装调试。
问题补充: |
|
2013-05-23 12:21:38
7, pumps and other equipment foundation with the arrival of equipment verification after installation and commissioning, and under the guidance of the equipment manufacturers.
|
|
2013-05-23 12:23:18
7, water pumps, and other devices with the construction of basis should be the device after verification, the device manufacturers and carried out under the guidance of the commissioning and installation.
|
|
2013-05-23 12:24:58
正在翻译,请等待...
|
|
2013-05-23 12:26:38
Foundation construction of 7, pumps and other equipment should be certified with the arrival of devices, and then and in the manufacturer's instructions to install the debugging.
|
|
2013-05-23 12:28:18
7th, equipment foundation constructions and so on water pump should unmistakable again carry on after the arrival of shipment equipment checkup, and carries on in under the equipment manufacturer instruction installs the debugging.
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区