求翻译:、管道施工完成后应进行水压试验,试验压力为工作压力的1.5倍,并不得小于0.7MPa。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
、管道施工完成后应进行水压试验,试验压力为工作压力的1.5倍,并不得小于0.7MPa。
问题补充: |
|
2013-05-23 12:21:38
Hydrostatic testing should be carried out after the completion of the pipeline construction, the test pressure is 1.5 times the working pressure, and shall not be less than 0.7mpa.
|
|
2013-05-23 12:23:18
And pipeline construction has been completed should be hydrostatically tested, the test pressure is the pressure of 1.5 times, and must not be less than 0.7 MPa.
|
|
2013-05-23 12:24:58
After, the pipeline construction completes should carry on the hydraulic pressure test, the test pressure for working pressure 1.5 times, and does not have to be smaller than 0.7MPa.
|
|
2013-05-23 12:26:38
, Pipe hydraulic test should be carried out after construction is complete, the test pressure is 1.5 times working pressure times, and must not be less than 0.7MPa.
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|