求翻译:2008年2月29日 首钢京唐联合钢铁有限公司1号5500 m3高炉干法除尘工程,热管散热器3台。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
2008年2月29日 首钢京唐联合钢铁有限公司1号5500 m3高炉干法除尘工程,热管散热器3台。
问题补充:

  • 匿名
2013-05-23 12:21:38
February 29, 2008 Shougang Jingtang United Iron and Steel Co., Ltd. No. 1, 5500 m3 blast furnace dry dust removal project, three heat pipe radiator.
  • 匿名
2013-05-23 12:23:18
February 29, 2008 Beijing shougang Tang joint Iron and Steel Company Limited 5500 No. 1 m 3 blast furnace dust dry heat pipe radiators works 3.
  • 匿名
2013-05-23 12:24:58
On February 29, 2008 Beijing Steel Corporation Beijing Tang unite the steel and iron limited company 1 5500 m3 blast furnace dry process dust removal project, heat pipe radiator 3.
  • 匿名
2013-05-23 12:26:38
February 29, 2008, Shougang Tang combined with iron and steel, 1th 5500 M3 dry dedusting of blast furnace engineering, heat pipe heat sink 3.
  • 匿名
2013-05-23 12:28:18
February 29, 2008, Shougang Tang combined with iron and steel, 1th 5500 M3 dry dedusting of blast furnace engineering, heat pipe heat sink 3.
 
 