当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:再在前、后底梁中心线上及两旁空腔位置,视不同载重车型所需吸能量的大小,均匀配装若干个副吸能器是什么意思?

待解决 悬赏分:1 - 离问题结束还有
再在前、后底梁中心线上及两旁空腔位置,视不同载重车型所需吸能量的大小,均匀配装若干个副吸能器
问题补充:

  • 匿名
2013-05-23 12:21:38
Front, after the end of the beam center line and on both sides of the cavity position, depending on load models required size of the absorption of energy, uniformly equipped with a number of deputy energy absorption
  • 匿名
2013-05-23 12:23:18
And then the front and the rear on the center line and the two next to an empty cavity position, depending on the load in the energy of the size you need, even with a number of deputy energy-absorbing.
  • 匿名
2013-05-23 12:24:58
Again in the before and after bottom millstone middle line and both sides the cavity position, regards the different carrying capacity vehicle type to have to attract the energy the size, even fittings certain vice-power absorbers
  • 匿名
2013-05-23 12:26:38
Before and after the beam on the centre line and at the end of cavity locations on either side, depending on the size of the energy absorption needed to load models, even equipped with several Deputy energy absorbing device
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭