|
关注:1
2013-05-23 12:21
求翻译:焊好吸能器的底板按设计位置分别焊接安装在底梁内侧是什么意思? 待解决
悬赏分:1
- 离问题结束还有
焊好吸能器的底板按设计位置分别焊接安装在底梁内侧
问题补充: |
|
2013-05-23 12:21:38
Installed in the end of the beam inside of welding good energy absorption backplane design position welding
|
|
2013-05-23 12:23:18
Solder the suction to the floor, according to the design position in soldering on the inside bottom beam
|
|
2013-05-23 12:24:58
正在翻译,请等待...
|
|
2013-05-23 12:26:38
Backplane design of welding and good energy absorption medial location welding and installation at the end of beam
|
|
2013-05-23 12:28:18
Welds the power absorber the ledger wall according to design the position to weld separately installs in the bottom millstone inside
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区