当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:外架拆除前,工长要向拆架施工人员进行书面安全交底工作。交底有接受人签字。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
外架拆除前,工长要向拆架施工人员进行书面安全交底工作。交底有接受人签字。
问题补充:

  • 匿名
2013-05-23 12:21:38
Removing the front of the outer frame, the foreman to the construction workers Dismantling written safety tests, work. The tests have to accept signature.
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
Before the frame demolition, the section chief must to open the constructor to carry on the written security to give the low-down the work.Gives the low-down has accepts the human to sign.
  • 匿名
2013-05-23 12:26:38
Outside the frame before the demolition, foreman to break to construction personnel conduct written Security gives the low-down. Signed by the low-down to receive.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭