|
关注:1
2013-05-23 12:21
求翻译:外架拆除前,工长要向拆架施工人员进行书面安全交底工作。交底有接受人签字。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
外架拆除前,工长要向拆架施工人员进行书面安全交底工作。交底有接受人签字。
问题补充: |
|
2013-05-23 12:21:38
Removing the front of the outer frame, the foreman to the construction workers Dismantling written safety tests, work. The tests have to accept signature.
|
|
2013-05-23 12:23:18
正在翻译,请等待...
|
|
2013-05-23 12:24:58
Before the frame demolition, the section chief must to open the constructor to carry on the written security to give the low-down the work.Gives the low-down has accepts the human to sign.
|
|
2013-05-23 12:26:38
Outside the frame before the demolition, foreman to break to construction personnel conduct written Security gives the low-down. Signed by the low-down to receive.
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区