求翻译:每搭设两步架后必须进行检查验收,并填写悬挑脚手架验收表。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
每搭设两步架后必须进行检查验收,并填写悬挑脚手架验收表。
问题补充:

  • 匿名
2013-05-23 12:21:38
Must be carried out in the after every erection of a two-step frame inspection and acceptance, and fill out the cantilevered scaffolding acceptance table.
  • 匿名
2013-05-23 12:23:18
Set up a two-step after acceptance, you must check out suspension scaffolds and fill out acceptance form.
  • 匿名
2013-05-23 12:24:58
Puts up two step frame to have after every time to carry on the inspection approval, and fills in hangs selects the scaffold approval table.
  • 匿名
2013-05-23 12:26:38
Each putting up two steps must be carried out after inspection and acceptance, and fill out the acceptance form of overhanging scaffold.