|
关注:1
2013-05-23 12:21
求翻译:对于外单在投产前,工程设计的内部资料必须由主管审核,审核结果做好记录做为设计员效益考核依据是什么意思? 待解决
悬赏分:1
- 离问题结束还有
对于外单在投产前,工程设计的内部资料必须由主管审核,审核结果做好记录做为设计员效益考核依据
问题补充: |
|
2013-05-23 12:21:38
The single outside before going into production, engineering internal data must be in charge of the audit, the audit results to make a record as a benefit assessment based on designer
|
|
2013-05-23 12:23:18
Click on the pre-production, and engineering design of the internal information must be reviewed by a supervisor, audit results do a good job for the design record based on the efficiency assessment
|
|
2013-05-23 12:24:58
Regarding the outside list before the production, the engineering design restricted data must verify by the manager, the verification result completes the recording to do for the estimator benefit inspection basis
|
|
2013-05-23 12:26:38
For foreign single before we start production, design of internal information must be examined by the competent, results of audit record as a designer benefit assessment based on
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区