|
关注:1
2013-05-23 12:21
求翻译:Our field engineering must be equipped with tools such as pre-approved installation tolerances, universal material substitutions and other pre-arranged compensatory measures when interferences, conflicts and design omissions are encountered. This will further reduce the number of formal field changes that will need to是什么意思?![]() ![]() Our field engineering must be equipped with tools such as pre-approved installation tolerances, universal material substitutions and other pre-arranged compensatory measures when interferences, conflicts and design omissions are encountered. This will further reduce the number of formal field changes that will need to
问题补充: |
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区