当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:增加两处刚性吊杆吊点,另外,将3处弹簧吊点换成了刚性吊杆吊点,是什么意思?

待解决 悬赏分:1 - 离问题结束还有
增加两处刚性吊杆吊点,另外,将3处弹簧吊点换成了刚性吊杆吊点,
问题补充:

  • 匿名
2013-05-23 12:21:38
Increased two rigid boom crane Point, three springs hanging point replaced by a rigid boom cranes point
  • 匿名
2013-05-23 12:23:18
The two rigid boom lift points, in addition, there will be 3 spring lift points into the rigid boom lift points.
  • 匿名
2013-05-23 12:24:58
Increases two rigid suspension bar to hang the spot, moreover, hung 3 springs the spot to change into the rigid suspension bar to hang the spot,
  • 匿名
2013-05-23 12:26:38
Increased two rigid boom lifting point, in addition to 3 spring hanging point to the rigid boom lifting point,
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭