|
关注:1
2013-05-23 12:21
求翻译:增加两处刚性吊杆吊点,另外,有3处弹簧吊点换成了刚性吊杆吊点,是什么意思? 待解决
悬赏分:1
- 离问题结束还有
增加两处刚性吊杆吊点,另外,有3处弹簧吊点换成了刚性吊杆吊点,
问题补充: |
|
2013-05-23 12:21:38
Increased two rigid boom crane Point three spring hanging point replaced by a rigid boom lifting point
|
|
2013-05-23 12:23:18
The two rigid boom lift points, in addition, there are 3 spring lift points into the rigid boom lift points.
|
|
2013-05-23 12:24:58
Increases two rigid suspension bar to hang the spot, moreover, some 3 springs hung the spot to change into the rigid suspension bar to hang the spot,
|
|
2013-05-23 12:26:38
Increased two rigid hangers hanging points, in addition, there are 3 spring hanging point to the rigid boom lifting point,
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区