|
关注:1
2013-05-23 12:21
求翻译:设计方在此之前没有参与过类似项目的设计,缺乏对核电站放射性固体废物处理系统设计经验。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
设计方在此之前没有参与过类似项目的设计,缺乏对核电站放射性固体废物处理系统设计经验。
问题补充: |
|
2013-05-23 12:21:38
Designer before this was not involved in the design of similar projects, the lack of experience in the design of the nuclear power plant radioactive solid waste disposal system.
|
|
2013-05-23 12:23:18
Before this design did not participate in a similar project, the design of nuclear power plants lack radioactive solid waste disposal system design experience.
|
|
2013-05-23 12:24:58
正在翻译,请等待...
|
|
2013-05-23 12:26:38
Design prior to this design were not involved in similar projects, lack of solid radioactive waste processing system design experience on nuclear power plants.
|
|
2013-05-23 12:28:18
The design side before then has not participated in the similar project design, lacks to the nuclear power station radioactive solid waste processing system design experience.
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区