|
关注:1
2013-05-23 12:21
求翻译:经过对灭菌器的运行测试,灭菌器的各项物理性能都达到设计要求,可以进行满载时的PQ性能鉴定是什么意思?![]() ![]() 经过对灭菌器的运行测试,灭菌器的各项物理性能都达到设计要求,可以进行满载时的PQ性能鉴定
问题补充: |
|
2013-05-23 12:21:38
After running the test on the sterilizer, the physical properties of the sterilizer to meet the design requirements, can be loaded with the pq performance when identification
|
|
2013-05-23 12:23:18
After the autoclave sterilizer, running the test of the physical performance requirements are met, you can design a full load of PQ performance
|
|
2013-05-23 12:24:58
Passes through to the sterilizer movement test, the sterilizer each physical performance all achieved the design request, may carry on when the full load PQ performance evaluation
|
|
2013-05-23 12:26:38
After run tests on the sterilizers, sterilizer's physical performance meet the design requirements, can be lifted when the PQ performance appraisal
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区