|
关注:1
2013-05-23 12:21
求翻译:6.1委托人应负责与本建设工程造价咨询业务有关的第三人的协调,为咨询人工作提供外部条件。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
6.1委托人应负责与本建设工程造价咨询业务有关的第三人的协调,为咨询人工作提供外部条件。
问题补充: |
|
2013-05-23 12:21:38
6.1 The principal shall be responsible for the coordination of a third person, the construction engineering cost consulting business and external conditions for the work of the consultants.
|
|
2013-05-23 12:23:18
6.1 with the principal shall be responsible for building the business for the cost of the first 3 people to the coordination and advisory work with external conditions.
|
|
2013-05-23 12:24:58
6.1 trustees should be responsible with this construction project construction cost consultation service related third human of coordination, for consults the human to work provides the external condition.
|
|
2013-05-23 12:26:38
6.1 seller shall be responsible for the construction of engineering cost consulting business-related third party coordination, providing external conditions for consultancy work.
|
|
2013-05-23 12:28:18
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区