当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:函件中提到的问题我单位均按照设计图纸施工,如需改动或者增加设计请与设计单位联系。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
函件中提到的问题我单位均按照设计图纸施工,如需改动或者增加设计请与设计单位联系。
问题补充:

  • 匿名
2013-05-23 12:21:38
Easy to install factory oil and gas pipelines bracket order pipeline welding only part of the weld, is now installing the pipeline portion of the bracket units have been installed welders welding;
  • 匿名
2013-05-23 12:23:18
In his letter referred to in the question, I work in accordance with the design drawings, such as changes to design or enhance your design unit.
  • 匿名
2013-05-23 12:24:58
In the letters mentioned the question I the unit defer to the design paper construction, if must modify or the increase design please with the designing department relation.
  • 匿名
2013-05-23 12:26:38
Plant oil and gas pipe for pipe installation convenience, only part is welded welds, is now installing the bracket of the pipe segment we installed welders for welding;
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待... 正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭