|
关注:1
2013-05-23 12:21
求翻译:在开发过程中,需求的变化是不可避免的。增量模型的灵活性可以使其适应这种变化的能力大大优于瀑布模型和快速原型模型,但也很容易退化为边做边改模型,从而使软件过程的控制失去整体性。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
在开发过程中,需求的变化是不可避免的。增量模型的灵活性可以使其适应这种变化的能力大大优于瀑布模型和快速原型模型,但也很容易退化为边做边改模型,从而使软件过程的控制失去整体性。
问题补充: |
|
2013-05-23 12:21:38
During the development process, the change in demand is inevitable. Incremental model flexibility is the ability to adapt to this change is much better than the waterfall model and rapid prototyping model, but also easily degenerate into the side of doing to change the model, and thus lose the integ
|
|
2013-05-23 12:23:18
During the development process, the demand for change is inevitable. The incremental model flexibility to be able to adapt to this change considerably better than the waterfall model, and rapid prototyping model, but it is also very susceptible to degradation by doing a model, so that the software p
|
|
2013-05-23 12:24:58
In the performance history, the demand change is inevitable.The increase model flexibility may cause it to adapt this kind of change ability to surpass the waterfall model and the fast prototype model greatly, but very is also easy to degenerate for does while changes the model, thus causes the soft
|
|
2013-05-23 12:26:38
During the development process, changes in demand are inevitable. Incremental model flexibility enabling its ability to adapt to the change is much better than a waterfall model and rapid prototyping models, but also easily degenerate into doing reform model, allowing software control of loss of int
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区