|
关注:1
2013-05-23 12:21
求翻译:3.负责现场的例行施工进度检查以及和分包提交的深化图纸的审批工作。4.负责陪同主设计师到材料厂进行选材比如到石材厂挑选石材,到家具厂选家具等。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
3.负责现场的例行施工进度检查以及和分包提交的深化图纸的审批工作。4.负责陪同主设计师到材料厂进行选材比如到石材厂挑选石材,到家具厂选家具等。
问题补充: |
|
2013-05-23 12:21:38
Responsible for on-site the routine construction schedule check and subcontractors submitted deepen drawings for approval. Responsible to accompany the main designer to materials plant selection such as selection of stone to stone factory, selected furniture to a furniture factory.
|
|
2013-05-23 12:23:18
3.responsible for on-site construction progress inspections and routine and sub-packages to the deepening of the drawing. 4.responsible for accompanying the designers to materials such as plant material selection for the stone to stone, and plant selection furniture factory options, such as furnitur
|
|
2013-05-23 12:24:58
3. is responsible for the scene the routine construction progress inspection as well as with the subpackage submission deepened blueprint examination and approval work.4. is responsible to accompany the lead designer to carry on the selection to the store depot for instance to the stone material fac
|
|
2013-05-23 12:26:38
3. responsible for routine inspection of construction progress on the ground and deepening approval drawings submitted and subcontracting work. 4. responsible for accompanying the main designers for material such as stone plants selected stone material factory, to furniture factory selected furnitur
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区