当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:本技术技术协议仅适用于杭锦煤矸石发电厂2×330MW机组工程500kV 交流高压隔离开关设备,它提出该设备本体及其辅助设备的功能设计、结构、性能、安装和试验等方面的技术要求。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
本技术技术协议仅适用于杭锦煤矸石发电厂2×330MW机组工程500kV 交流高压隔离开关设备,它提出该设备本体及其辅助设备的功能设计、结构、性能、安装和试验等方面的技术要求。
问题补充:

  • 匿名
2013-05-23 12:21:38
The the technology agreement applies only to equipment in the coal gangue power plant Hangjin 2 × 330mw unit project 500kv AC high voltage isolation switch, it presents the functional design of the device body and its auxiliary equipment, structure, performance, installation, and testing and other a
  • 匿名
2013-05-23 12:23:18
This technology agreement applies only to coal power plants, coal stone 2 ×330 500 MW kV exchange unit works under pressure isolation switch device, it made the device body and its auxiliary equipment, functional design, architecture, performance, installation, and testing of technical requirements.
  • 匿名
2013-05-23 12:24:58
This technical technology agreement is only suitable for the hanggin gangue power plant 2×330MW unit project 500kV a.c. high voltage isolator equipment, it proposes this equipment aspect and so on main body and supporting facility functional design, structure, performance, installment and experiment
  • 匿名
2013-05-23 12:26:38
This technical agreement applies only to Hang Jin gangue power plant 2x330MW unit project 500kV AC high voltage isolate switch device, which features of the ontology and its auxiliary equipment design, construction, performance, installation, and testing of technical requirements.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭