|
关注:1
2013-05-23 12:21
求翻译:The awarded Design Team shall be responsible for the direction and integration of the work of the consultants and shall act as an overall coordinator for the project. The general scope of the design consultancy contract shall include but will not be limited to the following:是什么意思? 待解决
悬赏分:1
- 离问题结束还有
The awarded Design Team shall be responsible for the direction and integration of the work of the consultants and shall act as an overall coordinator for the project. The general scope of the design consultancy contract shall include but will not be limited to the following:
问题补充: |
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区