|
关注:1
2013-05-23 12:21
求翻译:O acabamento superficial da base será com chapisco no traço 1:3 e argamassa de cimento e areia peneirado traço 1:3 até 10 cm abaixo do nível de empedramento.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
O acabamento superficial da base será com chapisco no traço 1:3 e argamassa de cimento e areia peneirado traço 1:3 até 10 cm abaixo do nível de empedramento.
问题补充: |
|
2013-05-23 12:21:38
the surface finish of the base will be in 1:3 ratio with roughcast and mortar and sieved sand 1:3 ratio up to 10 cm below the level of metalling.
|
|
2013-05-23 12:23:18
The surface finish of the base will be with coarse in Mark 1:3 and cement mortar and sifted sand trace 1:3 up to 10 cm below the level of metalling.
|
|
2013-05-23 12:24:58
The superficial finishing of the base will be with chapisco in the 1:3 trace and mortar of cement and sand bolted 1:3 trace up to 10 cm below of the empedramento level.
|
|
2013-05-23 12:26:38
The surface finish of the base will be with roughening in dash 1: 3 cement-sand mortar and sifted dash 1: 3 up to 10 cm below the level of empedramento.
|
|
2013-05-23 12:28:18
O acabamento 表面的 da 基础血清 com chapisco 没有 traco 1:3 e argamassa de cimento e areia peneirado traco 1:3 吃 10 厘米 abaixo 做 nivel de empedramento。
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区