当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The capital expenditures associated with the proposed wind farm are EUR 75,552,313 and EUR 72,022,241 for the sample turbine type Gamesa G80 2,000 kW with HH 78m and HH 60m, respectively. Contingencies were included (10%) to avoid the project coming under financial stress in the event that planning and material needs d是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The capital expenditures associated with the proposed wind farm are EUR 75,552,313 and EUR 72,022,241 for the sample turbine type Gamesa G80 2,000 kW with HH 78m and HH 60m, respectively. Contingencies were included (10%) to avoid the project coming under financial stress in the event that planning and material needs d
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
资本支出与提出的风力场相关分别为样品涡轮类型的Gamesa G80 EUR 75,552,313和EUR 72,022,241与HH 78m的2,000 kW和HH 60m。意外情况包括(10%)避免受到财政压力的项目,在计划和物质需要从期望情况下偏离。
  • 匿名
2013-05-23 12:24:58
资本支出与提出的风农场相关分别为EUR 75,552,313和EUR 72,022,241为样品涡轮类型Gamesa G80 2,000千瓦与HH 78m和HH 60m。 在计划和 (物质) 需要从期望情况下,偏离意外情况是避免项目的包括10%受到财政重音。
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
与拟议的风能农场相关的资本支出是欧洲 75,552,313 和欧洲例子涡轮类型 Gamesa G80 的 72,022,241 有时的 2,000 kW 七千八百万和时六千万,分别地。意外事故被包括 (10%) 避免被包括在财政压力之内的项目如果制定计划和材料从预期需要不正常者。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭