|
关注:1
2013-05-23 12:21
求翻译:Supply, install, connect, test and commission the following points for lighting, exhaust fans emergency lights, exit signs, switches, P.B. control panels, boxes, covers, conduits, wires, and all necessary as per drawings, schedule of points, specifications, MEW latest regulation, requirements and to the satisfaction a是什么意思? 待解决
悬赏分:1
- 离问题结束还有
Supply, install, connect, test and commission the following points for lighting, exhaust fans emergency lights, exit signs, switches, P.B. control panels, boxes, covers, conduits, wires, and all necessary as per drawings, schedule of points, specifications, MEW latest regulation, requirements and to the satisfaction a
问题补充: |
|
2013-05-23 12:21:38
供应,安装,连接,测试及佣金照明,排气扇应急灯,出口标志,开关,PB以下几点控制面板,盒,井盖,管道,电线和所有必要的,因为每个图纸,点的时间表,规格,海鸥最新规定,要求和工程师的满意度和批准。
|
|
2013-05-23 12:23:18
供应,安装,连接,测试并且委任点燃的下列问题,排气扇应急灯,出口标志,开关, P.B.控制板,箱子,盖子,输送管道,导线,并且所有必要根据图画,点,规格日程表,喵喵叫最新的章程,要求和对工程师的满意和认同。
|
|
2013-05-23 12:24:58
供应,安装,连接,测试并且委任以下点为照明设备,排气扇应急灯,出口标志,开关, P.B。 控制板、箱子、盖子、输送管道,导线和所有必要根据图画,点,规格日程表,喵喵叫最新的章程,要求和到工程师的满意和认同。
|
|
2013-05-23 12:26:38
供应、 安装、 连接、 测试和委员会以下点为照明、 排气风扇应急灯、 出口标志、 开关、 花生酱控制板、 框、 盖、 管道、 电线、 和所有必要的图纸,按附表点、 规格、 水电部最新法规,要求和满意程度和工程师的批准。
|
|
2013-05-23 12:28:18
供应,安装,连接,为照明委托以下点的测试,消音器爱好者紧急情况灯,退出 签名,转换, P.B. 控制面板,盒子,封面,渠道,电线,所有必备根据素描,点,规格的时间表,巢最新发展规则,要求和到满意和工程师的审批。
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区