|
关注:1
2013-05-23 12:21
求翻译:all bends, connecting saddle, clamping saddle, connection, end flange cap adaptors, offset units, fly over units all necessary accessories earth bonding links etc. as per drawings, schedule of points specifications, MEW regulations, requirements and to the approval of the Engineer.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
all bends, connecting saddle, clamping saddle, connection, end flange cap adaptors, offset units, fly over units all necessary accessories earth bonding links etc. as per drawings, schedule of points specifications, MEW regulations, requirements and to the approval of the Engineer.
问题补充: |
|
2013-05-23 12:21:38
所有弯曲,连接马鞍,夹紧鞍座,连接端法兰盖适配器,偏移单位,飞越单位按照图纸点规格,海鸥法规,要求,进度和工程师批准的所有必要的配件地球粘接链接等。
|
|
2013-05-23 12:23:18
所有弯曲,连接马鞍,夹紧马鞍、连接、末端耳轮缘盖帽适配器、垂距单位,飞行在单位全部必要的辅助部件地球接合链接等根据图画,点规格日程表,喵喵叫章程,要求和对工程师的认同。
|
|
2013-05-23 12:24:58
所有弯曲,连接马鞍,夹紧马鞍、连接、末端耳轮缘盖帽适配器、垂距单位,飞行结束单位全部必要的辅助部件地球接合链接等。 根据图画,点规格日程表,喵喵叫章程,要求和到工程师的认同。
|
|
2013-05-23 12:26:38
所有折弯,连接马鞍,夹紧马鞍上的连接,结束法兰章适配器、 偏移量单位、 粘接链接按图纸等必要配件地球上所有单位都飞过、 计划点规格、 水电部法规、 要求和工程师的批准。
|
|
2013-05-23 12:28:18
都弯曲,连接鞍,夹住鞍,连接,终止边缘帽子适配器,补偿单位,在单位上方都飞行结合联系的必要附件地球等等根据素描,点规格,巢规则的时间表,要求和到工程师的审批。
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区