当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:施工区域临时围墙已经建好,基础工程阶段只考虑办公区域及加工场地的施工围栏。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
施工区域临时围墙已经建好,基础工程阶段只考虑办公区域及加工场地的施工围栏。
问题补充:

  • 匿名
2013-05-23 12:21:38
Construction zone temporary wall has been built, only consider the basic engineering phase of the regional office and processing of the construction site fence.
  • 匿名
2013-05-23 12:23:18
Construction regional temporary wall has been built, and the foundation stage works take into account only the office area and processing venues construction fence.
  • 匿名
2013-05-23 12:24:58
The construction region temporary fence already constructed, the foundation engineering stage only considered the work region and processed the location the construction railing.
  • 匿名
2013-05-23 12:26:38
Construction zone temporary fences have been built, basic engineering phase only considers construction of Office area and process site fence.
  • 匿名
2013-05-23 12:28:18
The construction region temporary fence already constructed, the foundation engineering stage only considered the work region and processed the location the construction railing.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭