当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:then segmengtal construction technique also has been used wich precast segments. the technique originated in france and as been used in the construction of bridges having spans in excess of 300ft.the eminent french engineer jean muller is credited with originating precast segmental bridge construction using matchcast s是什么意思?

待解决 悬赏分:1 - 离问题结束还有
then segmengtal construction technique also has been used wich precast segments. the technique originated in france and as been used in the construction of bridges having spans in excess of 300ft.the eminent french engineer jean muller is credited with originating precast segmental bridge construction using matchcast s
问题补充:

  • 匿名
2013-05-23 12:21:38
然后segmengtal的施工技术也已用于至极预制段。起源于法国的技术,被用来建造桥梁的跨度超过了著名的法国工程师Jean 300ft.the穆勒计入原产预制节段桥梁建设使用matchcast段,预制段可能
  • 匿名
2013-05-23 12:23:18
然后的segmengtal建筑技术已造形段也使用了。于法国发起的技术和如用于桥梁的建筑有间距超出300ft.the突出的法国工程师斜纹布研磨器相信发源被已造形的分装式桥梁建筑使用被已造形的段可以的matchcast段
  • 匿名
2013-05-23 12:24:58
然后也使用了segmengtal建筑技术已造形段。 于法国发起的技术和如用于桥梁的建筑有间距超出300ft.the突出的法国工程师斜纹布研磨器相信发源被已造形的分装式桥梁建筑使用被已造形的段可以的matchcast段
  • 匿名
2013-05-23 12:26:38
然后 segmengtal 施工技术也已用于的至极预制段。技术起源于法国和已使用的建筑桥梁有跨度超过 300ft.the 杰出的法国工程师缪勒与原产预制节段桥施工使用 matchcast 段预制可能贷记
  • 匿名
2013-05-23 12:28:18
然后 segmengtal 建造技术也被使用了是的 wich 预制段。技术起源于法国和如在超过 300 ft.the 台卓越法国工程师斜纹布研磨机有距离的桥的建造中使用通过使用 matchcast 引起预制的 segmental 桥建造被相信段预制的段愿
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭