|
关注:1
2013-05-23 12:21
求翻译:But In this way, if the audited entity has an implemented risk management that is proved to be efficient, this will represent a starting point for the auditor in evaluating the risks connected to his engagement, meaning that the general audit risk will be lower and the assurance level will be higher.是什么意思?![]() ![]() But In this way, if the audited entity has an implemented risk management that is proved to be efficient, this will represent a starting point for the auditor in evaluating the risks connected to his engagement, meaning that the general audit risk will be lower and the assurance level will be higher.
问题补充: |
|
2013-05-23 12:21:38
但这种方式,如果被审计单位实施风险管理,是被证明是有效的,这将代表连接到他的订婚的风险评估为核数师的起点,也就是说,一般的审计风险将会降低,保证水平会更高。
|
|
2013-05-23 12:23:18
但这样,如果审计实体执行了一个风险管理,是证明是有效率,这将是一个起点,该核数师在评估有关的危险,他的参与,这意味着一般审计风险将会较低和保证级别将更高。
|
|
2013-05-23 12:24:58
但这样,如果被验核的个体有 被证明是高效率的被实施的风险管理,这在评估风险将代表一个出发点为审计员连接到他的订婚,意味一般审计风险将是更低的,并且保证水平更高。
|
|
2013-05-23 12:26:38
但这种方式,如果经审计的实体已实施的风险管理是证明是有效的这将代表一个起点核数师在评估风险相连的婚约,意味着一般审计风险将会降低,保证水平会更高。
|
|
2013-05-23 12:28:18
但这样,如果被验核的个体有 被证明是高效率的被实施的风险管理,这在评估风险将代表一个出发点为审计员连接到他的订婚,意味一般审计风险将是更低的,并且保证水平更高。
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区