当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The critical system parameters should be selected in such a way that they are able to accurately capture system transient behavior in predicting loss of synchronism before unstable swings really occur. Here, voltage phase angles of high voltage buses instead of generator angles are collected for the following reason是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The critical system parameters should be selected in such a way that they are able to accurately capture system transient behavior in predicting loss of synchronism before unstable swings really occur. Here, voltage phase angles of high voltage buses instead of generator angles are collected for the following reason
问题补充:

  • 匿名
2013-05-23 12:21:38
关键的系统参数应以这样一种方式,他们能够准确地捕捉系统暂态行为在预测失步前不稳定的波动确实发生被选中。此处,高电压总线而不是发电机电压的角度的相位角被收集的原因如下
  • 匿名
2013-05-23 12:23:18
应该选择关键系统参量,在这种情况下他们能准确地夺取在同相预言的损失的系统过渡过程特性,在不稳定的摇摆真正地发生前。这里,电压高压公共汽车相位角而不是发电器角度的为以下原因收集
  • 匿名
2013-05-23 12:24:58
应该选择关键系统参量,在这种情况下他们能准确地夺取系统过渡过程特性在同相预言的损失,在不稳定的摇摆真正地发生之前。 这里,电压高压公共汽车相位角而不是发电器角度为以下原因收集
  • 匿名
2013-05-23 12:26:38
关键的系统参数应选择在这种方式使它们能够准确地捕获系统瞬态行为在不稳定波动真正发生之前预测的同步性损失。在这里,电压相位角度的高电压巴士,改发电机角度收集以下原因
  • 匿名
2013-05-23 12:28:18
重要系统参数应该在这样一个路线被选择那他们能准确地在预测 synchronism 的损失方面获取系统瞬时现象行为在不稳定的秋千之前真的发生。在这里,电压阶段高电压公共汽车的钓鱼而非发电机钓鱼为以下理由被收集
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭