当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:By monitoring the full system behavior, uncontrolled system , separation occurs within 4 seconds after the fault clearance. 12 transmission lines are tripped by protective relays, which separate the whole Entergy system into two islands. The sequence of the cascading tripping events is shown in Table II. Two major gene是什么意思?

待解决 悬赏分:1 - 离问题结束还有
By monitoring the full system behavior, uncontrolled system , separation occurs within 4 seconds after the fault clearance. 12 transmission lines are tripped by protective relays, which separate the whole Entergy system into two islands. The sequence of the cascading tripping events is shown in Table II. Two major gene
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
通过监测充分的系统行为,未管制的系统,分离在故障排除以后的4秒钟内发生。12根送电线由防护中转绊倒,分离整个Entergy系统入两个海岛。落下的跳开的事件的序列在表II.显示。两个主要发电器小组在Entergy系统被形成。虽然整个Entergy系统是最后稳定的。动摆仍然存在于发电器活动电源产品和终端电压。
  • 匿名
2013-05-23 12:24:58
通过监测充分的系统行为,未管制的系统,分离在4秒钟内发生在故障排除以后。 12根送电线由防护中转绊倒,分离整体Entergy系统入二个海岛。 落下的tripping事件的序列在表II.显示。 二个主要发电器小组在Entergy系统被形成。 虽然整体Entergy系统是最后稳定的。 动摆仍然存在于发电器活动电源产品和终端电压。 并且,很多装载, 3970.52 MW+ 1238.57 MVAr,是棚子在Entergy地区在这种未管制的分离现象期间。 在这种情况下。 二个分支损失在系统创始严厉不稳定的摇摆并且导致落下的绊倒送电线。 什么是更加重要的,预言的艰苦这些线tripping序列。没有适当的
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭