求翻译:Site preparation, including clearing, grading and providing the drainage for the whole mobilization area; move-in and erection of contractor's installations as required for the completion of the works within the construction period, with the exception of those items entered separately in the Bill of是什么意思?![]() ![]() Site preparation, including clearing, grading and providing the drainage for the whole mobilization area; move-in and erection of contractor's installations as required for the completion of the works within the construction period, with the exception of those items entered separately in the Bill of
问题补充: |
|
2013-05-23 12:21:38
现场准备工作,包括清理,分级,并提供排水为整个动员区域;根据需要为完成建设期间内的作品,除了这些项目的布展和承包商的设备架设在该法案分别输入数量。该装置包括,但不限于设施,如承包商的工作人员,劳教所,餐饮设施,娱乐设施,工地办公室,商店,仓库,消防控制和保护,材料,堆场,车间,道路,人行道,停车区和临时道路
|
|
2013-05-23 12:23:18
场地准备,包括清洁,分级和提供排水设备为整个动员区域;承包商的设施的入住和架设如所需求工作的完成的在建设周期内,除在建筑工程清单分别地输入的那些项目外。
|
|
2013-05-23 12:24:58
场地准备,包括清洁,分级和提供排水设备为整体动员区域; 移动在和承包商的设施的架设如所需求为工作的完成在基建期间内,除在建筑工程清单分开地输入的那些项目之外。 设施包括,但没有被限制到设施例如承包商的职员和劳改营、承办的设施、文娱设施、站点办公室、商店、仓库、消防和保护、材料、围场、车间、车行道、小径、停车场和临时路
|
|
2013-05-23 12:26:38
场地准备工作,包括结算、 分级和为整个动员区 ; 提供排水移动中与承包商的设施所需的工程在施工期间,除了在工程量清单中分别输入这些项目内完成安装。这些装置包括,但不是限于设施承包商的工作人员和劳改营、 餐饮设施、 娱乐设施、 工地办公室、 商店、 仓库、 消防控制和保护、 材料、 码、 讲习班、 道路、 停车场和临时道路的行人路
|
|
2013-05-23 12:28:18