当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Working process of this system: first, forming components according to need of surface parameters, converted to the stamping hammer scale height, input the PLC program and then converted into time quantity, time relay by PLC automatic control and timing knife change each nail adjustable height and stamping forming..是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Working process of this system: first, forming components according to need of surface parameters, converted to the stamping hammer scale height, input the PLC program and then converted into time quantity, time relay by PLC automatic control and timing knife change each nail adjustable height and stamping forming..
问题补充:

  • 匿名
2013-05-23 12:21:38
该系统的工作流程:首先,根据需要的表面参数形成的组件,转换为冲压锤标高,输入PLC程序,然后转换成时间量,由PLC自动控制和时序刀时间继电器改变每个指甲高度可调和冲压成型..
  • 匿名
2013-05-23 12:23:18
这个系统的运作的过程:首先,按需要形成组分表面参量,转换成盖印的锤子标度高度,输入了PLC节目然后转换了成时间数量,由PLC自动控制和计时刀子的时间中转改变每钉子可调整的高度和盖印形成。
  • 匿名
2013-05-23 12:24:58
这个系统的运作的过程: 首先,形成组分根据表面参量的需要,被转换成盖印的锤子标度高度,输入PLC节目然后转换成时间数量,时间中转由PLC自动控制和计时刀子改变每钉子可调整的高度和盖印形成。
  • 匿名
2013-05-23 12:26:38
工作过程的这一制度: 第一,形成组件根据面参数,转换成的冲压的锤子规模高度,需要输入 PLC 程序,然后转换成时间数量、 时间继电器由 PLC 自动控制和定时刀改变每个钉可调高度和冲压成形...
  • 匿名
2013-05-23 12:28:18
操纵这个系统的过程:根据被转换为印上锤子规模高度的表面的参数的需要的第一,形成组件输入 PLC 程序,然后转换为时间的数量,由 PLC 自动控制所作的时间的接力和为刀子定时换给每个钉子可调高度和印上形成 ..
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭