当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:For each item, contractors decide whether to perform work themselves or hire a subcontractor and submit a bid. The deference between the work item quantity in the original contract and the quantity actually installed after revisions proxies for incompleteness. In estimation, I account for the strategic aspects of biddi是什么意思?

待解决 悬赏分:1 - 离问题结束还有
For each item, contractors decide whether to perform work themselves or hire a subcontractor and submit a bid. The deference between the work item quantity in the original contract and the quantity actually installed after revisions proxies for incompleteness. In estimation, I account for the strategic aspects of biddi
问题补充:

  • 匿名
2013-05-23 12:21:38
对于每个项目,承包商决定是否执行自己的工作或聘用分包商,并提交投标。工作项目数量在原来的合同和数量之间的尊重修订为代理后,不完全实际安装。的估计,我占招标投标从收回成本,并利用面板数据结构占分包决策的内生性的战略方面。平均而言,不完全解释了成本,2%,对于集成记录和一大截,13%,对于非集成的记录,一小部分。结果提供量化的证据支持在完成承包RM的理论和实践有signicance评估采购做法。
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
对于每个项,承建商决定是否自己执行工作或雇用分包商和提出收购要约。原始合同中的工作项数量和数量之间的差额实际上修改后安装的不完全性的代理。估计,我考虑招标投标从收回成本并利用面板数据结构来考虑的战略方面内在的分包合同的决定。平均而言,不完全性解释了 2%,为综合交易和很大的一部分,13%,为非集成的交易费用的一小部分。结果提供定量的证据证明在完成 rm 的订约理论,并有实际 signicance 评价采购做法。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭