当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:2、完成隧道开挖及初期支护后,立即进行仰拱二次衬砌混凝土的浇注。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
2、完成隧道开挖及初期支护后,立即进行仰拱二次衬砌混凝土的浇注。
问题补充:

  • 匿名
2013-05-23 12:21:38
2, completion of the tunnel excavation and initial support immediately after the invert cast concrete secondary lining.
  • 匿名
2013-05-23 12:23:18
2, completed tunnel digging and initial support care immediately after Yangshao arch 2 times the pouring concrete lining.
  • 匿名
2013-05-23 12:24:58
After 2nd, completes tunnel excavation and the initial period supports and protections, carries on immediately inverts two time lining work concrete casting.
  • 匿名
2013-05-23 12:26:38
2, after the completion of tunnel excavation and early support immediately invert secondary lining concrete pouring.
  • 匿名
2013-05-23 12:28:18
After 2nd, completes tunnel excavation and the initial period supports and protections, carries on immediately inverts two time lining work concrete casting.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭