当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:水沟电缆槽采用整体钢模、人工入模、每个工作面共三组钢模在立模、灌注、等强三工序上流水作业。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
水沟电缆槽采用整体钢模、人工入模、每个工作面共三组钢模在立模、灌注、等强三工序上流水作业。
问题补充:

  • 匿名
2013-05-23 12:21:38
Ditch the cable trough with the overall steel, artificial into the mold, each face a total of three sets of steel in the formwork, pouring, and other strong three processes on the assembly line.
  • 匿名
2013-05-23 12:23:18
ditch the whole cable trough steel mold, artificial into the model, each secluded 3 Group Total steel mold in the model, bored, such as subcontracting at the 3 processes.
  • 匿名
2013-05-23 12:24:58
The drainage cable tank uses the overall steel die, enters the mold, each working surface altogether three groups of steel dies artificially is setting up the mold, the irrigation, and so on the strong three working procedure headwater work.
  • 匿名
2013-05-23 12:26:38
Ditch cable tray with integral steel mould, artificial into the mold, each face a total of three groups in vertical mode, pouring, steel mould on a strong three-process flow.
  • 匿名
2013-05-23 12:28:18
The drainage cable tank uses the overall steel die, enters the mold, each working surface altogether three groups of steel dies artificially is setting up the mold, the irrigation, and so on the strong three working procedure headwater work.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭