|
关注:1
2013-05-23 12:21
求翻译:This paper presents the full-scale experimental test results of actual RC (reinforced concrete) metro shield TBM (tunnel boring machine) tunnel linings that are exposed to a standard ISO834 curve with 45 min and 90 min heating durations.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
This paper presents the full-scale experimental test results of actual RC (reinforced concrete) metro shield TBM (tunnel boring machine) tunnel linings that are exposed to a standard ISO834 curve with 45 min and 90 min heating durations.
问题补充: |
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区