|
关注:1
2013-05-23 12:21
求翻译:Guidelines should be set regarding the amount of time devoted to repair on site to determine whether or not equipment should be evacuated or reported to the next higher level and left to be repaired by following units. Contact teams report the location of items left behind to their parent maintenance control element. P是什么意思? 待解决
悬赏分:1
- 离问题结束还有
Guidelines should be set regarding the amount of time devoted to repair on site to determine whether or not equipment should be evacuated or reported to the next higher level and left to be repaired by following units. Contact teams report the location of items left behind to their parent maintenance control element. P
问题补充: |
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区